What manufacturers must be able to prove — and for how long
Imagine a market surveillance authority calls about a batch of products you shipped six years ago. Can you say which production run it came from, which raw materials went into it, which test records support its declared performance — and which customers received it? That is what traceability under the CPR comes down to, and it is far more than a number printed on a label.
The Construction Products Regulation never presents traceability as one neat requirement. It is assembled from four separate duties that only work when they work together. This article walks through each of them, shows where manufacturers most often leave gaps, and explains how the new CPR (Regulation (EU) 2024/3110) builds on the same foundations. The article numbers quoted below refer to Regulation (EU) No 305/2011, the regime under which most current Declarations of Performance and harmonised standards were built.
What traceability actually means under the CPR
In plain terms, you must be able to follow the trail in both directions: forwards from your factory to the customer, and backwards from the finished product to the materials, the production conditions and the tests behind it. The Commission’s delegated regulation amending the Declaration of Performance model (Delegated Regulation (EU) No 574/2014) is explicit that the purpose of the identification duty in Article 11(4) is to make any single construction product identifiable and traceable.
That trail rests on four building blocks:
- Identify the product with a type, batch or serial number
- Link that identifier to your production records through factory production control
- Keep the evidence for ten years
- Know who supplied you and whom you supplied
1. Identify the product: type, batch or serial number
Article 11(4) requires manufacturers to ensure that their construction products bear a type, batch or serial number, or any other element allowing their identification. Where the size or nature of the product does not allow that, the information goes on the packaging or in a document accompanying the product — which is how bulk and loose materials are normally handled, typically through the delivery note. The regulation leaves the choice of system to you: a batch code is enough, provided it genuinely lets you isolate what is affected.
Two layers matter here. The unique identification code of the product-type, which appears in the Declaration of Performance, tells you which set of declared performance values applies. The batch or serial number tells you which physical units or production run you are talking about. If you make your DoPs available on a website, as most manufacturers now do, Delegated Regulation (EU) No 157/2014 requires every product or batch to be linked to its DoP through the product-type code, so the two layers must be consistent. Article 11(5) adds that your name, registered trade name or trade mark, and a contact address (a single point where you can be reached) must appear on the product, its packaging or an accompanying document. Our guide to the Declaration of Performance explains how that code is used.
2. Connect the identifier to your production records
A batch number only becomes traceability when it opens a record. Your factory production control system is where that happens: starting from a batch number, you should be able to reach the production date and line, the raw material lots used, the process settings, the inspection and test results, and the DoP version that applied. Our article on Factory Production Control covers how to build that system; the traceability question is simply whether its records can be searched by batch.
Many harmonised standards add their own requirements on top. In structural steelwork, for example, the execution standard EN 1090-2 sets traceability requirements that tighten with the execution class, which is one reason structural manufacturers feel this duty more sharply. The chain should also tie back to the type testing behind the declared performance, so that the DoP, the test reports and the production batch can be shown to belong together.
3. Keep the evidence for ten years
Under Article 11(2), manufacturers must keep the technical documentation and the DoP for 10 years after the construction product has been placed on the market. The regulation allows the Commission to set a different period for particular products, so check whether one applies to yours. Because every batch is placed on the market on its own date, the clock effectively runs batch by batch. The safe approach is to retain everything for a product type until 10 years after the last batch of that type left your factory.
Two practical points follow. First, archive every superseded version of the DoP and the technical file together with its validity dates: a batch from 2019 must be answerable against the 2019 documents, not today’s. Second, if your DoPs are published online under Delegated Regulation 157/2014, they must remain accessible free of charge for the same period.
4. Know your supply chain
Article 16 applies to every economic operator — manufacturers, importers and distributors alike. On request, you must identify to market surveillance authorities any operator who supplied you with a product and any operator to whom you supplied one, and you must be able to do so for the 10-year period set out in Article 11(2). The principle is one step back and one step forward, not the whole chain, but you must be able to produce it quickly. In practice that means delivery notes and invoices that carry batch or serial numbers, and customer records that connect to them.
Why it matters: the recall test
Article 11(7) requires a manufacturer who considers, or has reason to believe, that a product is not in conformity with its DoP to take corrective measures immediately and, where appropriate, withdraw or recall it. Where the product presents a risk, the competent authorities must also be informed. With good traceability, you recall one batch. Without it, you recall everything you made in the period.
A quick test: pick a product you shipped eighteen months ago and see whether you can name, within an hour, its batch, its raw material lots, its test records, the DoP version that applied and the customers who received it. If any link takes a day to find, that is the link an authority — or a claim — will find first.
What changes under the new CPR
Regulation (EU) 2024/3110 applies from 8 January 2026 and repeals the 2011 Regulation, with transitional arrangements that keep parts of the old framework working for existing harmonised standards until January 2040. It does not abandon the traceability logic above; it strengthens it. Legal commentators point to stronger obligations on documentation, traceability and cooperation with authorities, and the regulation introduces a digital product passport system with unique identifiers, designed to make product data available electronically through a data carrier. Retention is spelled out too: under Article 20, economic operators keep documents for 10 years after they supplied or were supplied with the product, unless the information is available through the digital product passport, and must present them within 10 days of a request from an authority.
Which provisions apply to your product today depends on its product family and where it stands in the transition. Our New CPR 2024 page sets out the timeline. Until your product’s position is clear, treat the four building blocks above as your baseline: the new rules build on the same idea, so the groundwork is not wasted.
Where manufacturers most often fall short
- Batch numbers on the delivery note but not on the product, packaging or label, so a product found in the field cannot be linked back to its batch
- A product-type code in the DoP that differs from the one used in the technical file or on the website copy
- Records scattered across production, quality and sales systems with no common key, so every trace becomes a manual project
- Old DoPs and test reports deleted when a new version is issued, instead of being archived with validity dates
- Retention periods set by general document-retention rules that are shorter than the 10 years the CPR requires
- Mixing up the records for ETA-based products. The European Technical Assessment comes from the Technical Assessment Body, while any certificate required under the AVCP system specified in the EAD comes from a Notified Body. These are separate entities issuing separate documents, and both belong in your traceability file
Summary
Traceability under the CPR is not a single rule but a chain: an identifier on the product, production records behind it, ten years of retained evidence, and a clear record of who supplied whom. A weak link anywhere turns a small problem into a wide recall, or an uncomfortable conversation with an authority. The test is simple — if you can trace a real batch from customer back to raw material within an hour, your system works.