Regulation (EU) 2024/3110The regulation applies from 8 January 2026; product-specific obligations phase in by product family (Art. 95).
New regulation

The New Construction Products Regulation — What Every Manufacturer Must Know

CPR 2024/3110 replaces the 2011 regulation and introduces mandatory environmental declarations, a new document format (DoPC), and Digital Product Passports. The regulation applies from 8 January 2026; product-specific obligations phase in by product family (Art. 95).

Book a free CPR 2024 assessment
What changes

The Biggest Change to CE Marking Since 2013

New document

DoP → DoPC (New Document Format)

The Declaration of Performance (DoP) is replaced by the Declaration of Performance and Conformity (DoPC). The new document must include not only technical performance characteristics, but also safety, environmental, and climate-related characteristics.

Environment

Mandatory Environmental Declarations

For the first time, manufacturers must declare the environmental impact of their products — starting with Global Warming Potential (GWP/CO₂) and expanding through 2032 to a full set of life-cycle indicators.

Digital

Digital Product Passport (DPP)

A Digital Product Passport (Arts. 75–76) will link your DoPC, technical documentation and label to a unique digital record reached through a data carrier such as a QR code. The EU DPP Registry went live on 20 July 2026; the construction-specific rules will come in a delegated act.

Production

Updated FPC Requirements

Factory Production Control systems must be updated to capture environmental and climate data alongside the existing technical production parameters. Internal audit processes need to reflect the expanded DoPC content.

Enforcement

Stricter Market Surveillance & Penalties

From 8 January 2027, enforcement provisions and penalty frameworks for non-compliance with environmental performance declarations come into force.

Small firms

SME Simplified Procedures

Micro-enterprises (fewer than 10 employees, turnover under €2 million) may qualify for simplified procedures under Article 60 of CPR 2024. However, core obligations remain mandatory for all.

Quick check

Is your business ready?

If the answer to any item is no or unsure, a gap analysis is the sensible next step.

Book a CPR 2024 gap analysis

  • Know your harmonised standard status
  • DoP → DoPC transition planned
  • Environmental data collection started
  • FPC system reviewed for new requirements
  • DoPC available electronically on the website
  • Digital Product Passport awareness
Timeline

Implementation timeline

The transition from CPR 305/2011 to CPR 2024/3110 is gradual and product-specific. Here are the key dates you need to know.

Key dates of Regulation (EU) 2024/3110: published 18 December 2024, in force 7 January 2025, applies from 8 January 2026, penalties provision 8 January 2027, further environmental characteristics 2030 and 2032, Regulation 305/2011 fully repealed 8 January 2040
  1. Published in the Official Journal

    Regulation (EU) 2024/3110 is published.

  2. Enters into force

    A first group of provisions applies, including Articles 1 to 4 and Annexes I, II, III, IV, VII, IX and X.

  3. Application date

    The regulation applies. Standards listed under 305/2011 stay valid until withdrawn, and the operator duties of the new regulation apply to a product family one year after the implementing act covering it (Article 95).

  4. DPP Registry operational

    The EU Digital Product Passport Registry became operational. Construction products follow once the construction delegated act is adopted (Articles 75–76).

  5. Penalty rules notified

    Member States notify the Commission of their rules on penalties.

  6. Penalties provision applies

    Article 92 applies.

  7. More environmental characteristics

    Ozone depletion, acidification, eutrophication, photochemical ozone, resource and water use indicators (Annex II, points e to m).

  8. EADs from the old list expire

    European assessment documents listed under 305/2011 remain valid until this date, unless they expired earlier.

  9. Full life-cycle set

    Remaining indicators, Annex II points n to s.

  10. Last day for ETAs from old EADs

    Products are not placed on the market on the basis of those ETAs after this date.

  11. Old regulation fully repealed

    Articles of 305/2011 kept for old standards are repealed.

Questions

CPR 2024 FAQ

Do I need to re-do my current CE marking and DoP immediately?

Not immediately. Your existing DoP and CE marking under CPR 305/2011 remain valid for now. When a new harmonised technical specification under CPR 2024/3110 covers your product family, the new obligations, including the DoPC, apply one year after the implementing act covering it, unless that act sets a later date (Art. 95). CEProCon monitors the Commission’s Working Plan and can alert you when your product family’s transition date is confirmed.

What exactly is the DoPC, and how is it different from my current DoP?

The Declaration of Performance and Conformity (DoPC) replaces the Declaration of Performance (DoP). It still declares product performance against essential characteristics, but must additionally include environmental and climate-related characteristics, including GWP, and safety conformity information. You supply it electronically, or may publish it on a website in a human- and machine-readable, unamendable format with free access, as set out in Article 16(2).

When will the Digital Product Passport apply to my product?

The DPP duty for construction products starts 18 months after the entry into force of the delegated act that sets up the construction DPP system (Arts. 22(7) and 75). The Commission’s indicative plan is to adopt that act in Q2 2027, so the dates are not yet fixed. The EU DPP Registry has been operational since 20 July 2026. Products exempted under Article 14 are also exempt from the DPP (Art. 76(4)).

I have fewer than 10 employees. Do simplified procedures apply to me?

Possibly. Article 60 of CPR 2024/3110 introduces simplified procedures for micro-enterprises with fewer than 10 employees AND annual turnover below €2 million. However, core obligations — CE marking, DoPC, and environmental characteristics — remain mandatory for everyone.

Does CPR 2024 apply to manufacturers outside the EU?

Yes. CPR 2024/3110 applies to all construction products placed on the EU market, regardless of where the manufacturer is located. If you manufacture in Turkey, the UK, Ukraine or Asia and sell into the EU, you must comply. You may also need an EU Authorised Representative.

What happens to my CE marking if I change my product formula or raw materials?

Any significant change to your product may require reassessment of your declared performance. CEProCon performs change-impact assessments and advises whether a change triggers a new type test, revised DoPC, or notified body re-involvement. In some cases, a consultation with the Notified Body must be considered.

Where can I read the full text of CPR 2024/3110?

The full regulation is available on EUR-Lex — search for “Regulation EU 2024/3110” at eur-lex.europa.eu. The European Commission’s CPR implementation page is also at single-market-economy.ec.europa.eu

Scroll to Top